Primrose School
There was nothing elementary about the Primrose School project. Built on a formerly developed lot, we partnered with Caldwell Constructors to optimize every square inch of this small site. The 25' cut through rock for the rear wall was excavated in 4' increments to a near perfect vertical to allow for soil-nailing in stages. Another retaining wall was constructed on the lower end of the property in close proximity to existing apartments with zero hassles.
PROJECT DETAILS
PROJECT CLIENT/PARTNER
Caldwell Constructors
LOCATION
Greenville, SC
SIZE OF PROJECT
1.5 acres
6,000 CY
SERVICES PROVIDED
Clearing
Demolition
Erosion Control
Grading
Rock Excavation
Storm Drainage
Retaining Wall
Soil Nail Wall
Water and Sewer
Curb and Gutter
Asphalt Paving